Click Here to View This Page on Production Frontend
Click Here to Export Node Content
Click Here to View Printer-Friendly Version (Raw Backend)
Note: front-end display has links to styled print versions.
Content Node ID: 366767
SEO Title
Boston Logan’s Runway 15R/33L Closed for Maintenance
Subject Area
Channel
Content Body
The Massachusetts Port Authority has begun a seven-month closure of Runway 15R/33L at Boston Logan International Airport for resurfacing and to complete Runway Safety Area (RSA) construction at the departure end of Runway 15R. Following daily closures this month, the runway will be completely closed starting about June 15 through late September, ending with daily closures again in October and November. The enhanced RSA will extend the existing Engineered Material Arresting System (EMAS) bed to a total of 500 feet.
Expert Opinion
False
Ads Enabled
True
AIN Story ID
AN2050112alerts
Content Label
Publication Date (intermediate)
AIN Publication Date
----------------------------