Description

International regulators further suspended the North Atlantic datalink mandate to Feb. 25, 2021, to provide more flexibility for traffic that flies through the region during the Covid-19 crisis. The mandate, which went into effect January 30, 2020, would require aircraft to be equipped with FANS 1/A controller-pilot datalink communications and ADS-C (contract) equipment to transit through the North Atlantic tracks from FL290 to FL410.

UUID
149